Construction

The construction phase lasted from 1977–1982.

The museum is a reinforced concrete structure, supplemented in certain areas by brickwork (7,000 m³ concrete, 600 t construction steel, 40,000 m² formwork). The site drops away steeply from the Entrance Level on Abteistrasse, which (following excavation of 24,000 m³ of earth) facilitated construction of an underground section, partly visible on the garden-side elevation. The foundation pit, up to 12 m in depth, was secured using 1,200 m² of so-called Berlin-type shoring equipment plus further shoring (270 m²) comprised of 463 concrete bored piles. Earth compaction of the foundation level stood at 1,700 m².

In essence four materials were used for the facades: the closed tower facade and the temporary exhibition zone are clad in light-coloured sandstone (1,200 m²), the exhibition spaces on the Flagstone Level, including the shed roofs, are clad in titanium zinc sheeting (3,000 m²), all glazed facades are framed in aluminium (1,600 m²), and the “entrance” pavilion on the Flagstones Level is clad in white marble. The terraced zone of the abbey gardens and the exterior walls of the amorphous exhibition spaces were built of brick, so as to merge with the adjacent remains of the original city walls.

Sandstone was used also for the flagstone forecourt, the web section and all exterior stairways. Daylight falls directly into the exhibition spaces thanks to the north-facing (and hence ideal) shed roofs, individual dome lights, the grid of linked dome lights that comprises the roof of the main temporary exhibition zone, and the south-facing glazed facades of the middle and lower levels. Interior walls in the exhibition areas are rendered (10,000 m²). Certain spaces such as the lecture room, classroom and “multivision” (audiovisual) area are clad in specially designed wall elements made of timber and acoustic panels. Those roofs and ceilings not glazed are fitted with plasterboard (4,500 m²).

The flooring materials used include Koelga and Lasa marble (2,800 m²), velour carpet (1,200 m²), coconut matting (600 m², replaced in 2001 by floor screed), synthetics (950 m²), and laminates respectively parquet (300 m²). A total of 600 m of interior stairs were laid out (in marble) and 400 m of exterior stairs (in sandstone).*

 

*This text is taken from the press release announcing the opening of the Museum Abteiberg in 1982 and its reopening following the comprehensive renovation in 2007.

Outside

Rohbau MAM Sommer 1978 Foto Kaiser Ruth

Museum Abteiberg under construction, Mönchengladbach, summer 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM Oktober 1978 Foto Kaiser Ruth

Museum Abteiberg under construction, Mönchengladbach, October 1978, photo: Ruth Kaiser

Rohbau MAM Januar 1979 Foto Kaiser Ruth 02

Museum Abteiberg under construction, Mönchengladbach, January 1979, photo: Ruth Kaiser

Rohbau MAM Januar 1979 Foto Kaiser Ruth 03

Museum Abteiberg under construction, Mönchengladbach, January 1979, photo: Ruth Kaiser

Rohbau MAM Januar 1979 Foto Kaiser Ruth Detail Cafeterrasse

Museum Abteiberg under construction, Mönchengladbach, January 1979, photo: Ruth Kaiser

Rohbau MAM Januar 1979 Foto Kaiser Ruth

Museum Abteiberg under construction, Mönchengladbach, January 1979, photo: Ruth Kaiser

Rohbau MAM Februar 1979 Foto Kaiser Ruth

Museum Abteiberg under construction, Mönchengladbach, February 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 01

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Inside

Rohbau MAM 1978 Foto Kaiser Ruth 01

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth 03

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth 05

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth 06

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth 04

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1978 Foto Kaiser Ruth 02

Museum Abteiberg under construction, Mönchengladbach, 1978, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 01

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 10

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 11

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 07

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 08

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 09

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 05

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 06

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 03

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 02

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Rohbau MAM 1979 Foto Kaiser Ruth 04

Museum Abteiberg under construction, Mönchengladbach, 1979, photo: Ruth Kaiser

Learn more

Foto Nr 1230
Prehistory
Fig 57 Drawing of museum design credit missing
Design
Unbenannt 12
Planning & Implementation
Hans Hollein 1970 Foto Weber Albert
Hans Hollein
Cover Eva Branscome Hans Holleins Masterpiece 2025
EVA BRANSCOME Hans Hollein’s Masterpiece: Art, Architecture and the City
Eva Branscome's new book on the history of the Museum Abteiberg is now available.